DUKE EV · DUKE Electrical Group

EV Charger Installation South Yarra

Our A-grade electricians work from 128 Toorak Rd, a few minutes from South Yarra station, fitting chargers to apartments, terraces and houses on the CitiPower network.
Office
128 Toorak Rd, South Yarra
Serving
South Yarra 3141 (Stonnington and City of Melbourne sides)
Network
CitiPower
Licence
REC 35838 (VIC)

Request a quote

At the 2021 Census, 79.5% of South Yarra’s occupied homes were flats or apartments. Terraces, townhouses and semi-detached houses accounted for 12.8%, and separate houses for just 7.4%. That mix shapes every EV charger installation South Yarra job we take on: who owns the wall the charger is fixed to, how far it sits from the switchboard, and who else has to agree before a cable goes in.

We’re local. Our premises are at 128 Toorak Road, on the Stonnington side of Punt Road and a few minutes from South Yarra station. From there our A-grade electricians supply and install wall chargers, fit chargers that came with a new car from the dealer, and handle the work around them: switchboard upgrades, load management and, when a bigger supply is needed, the application to CitiPower.

EV charger installation South Yarra, building by building

Each type of building leads to a different job. In an apartment, the charger usually goes on or beside your space in a shared car park, and the owners corporation is involved from the start. On a terrace or townhouse it normally goes at the back or side of the block, which is where Stonnington’s heritage policy prefers car spaces to be, and most of the work is getting a circuit there from the meter. A separate house with a garage or driveway is the simplest case: the classic home EV charger installation most people picture.

Most households here run one car or none. The Census counted an average of 1.0 vehicles per dwelling, with 52.9% of households owning one registered vehicle and 27.6% owning none. For a single car, a 7 kW single-phase charger is usually plenty, and we’ll say so even when a bigger unit is on the table. CitiPower reckons a 7 kW wall unit typically restores 30 to 40 km of range in an hour of charging, and a car parked from dinner until breakfast rarely needs more.

Two-car homes are far more common next door, so our page on EV charger installation in Toorak focuses on load management, while street parking and narrow lots are covered under EV chargers for Windsor terraces and flats.

Getting a charger approved in a South Yarra apartment block

In most apartment buildings, even a charger on your own car space depends on common property somewhere along the way: a car park wall, a cable tray across the ceiling, a core hole through a slab, the main switch room. So the owners corporation is the first conversation, not the last. The Owners Corporations Act 2006 gives it three tools worth knowing about:

  • Significant alterations. An owners corporation can’t significantly change the use or look of common property without a special resolution, unless another exception in the Act applies.
  • Leases and licences. By special resolution an owners corporation can grant a lot owner a lease or licence over part of the common property, which can suit a charger fixed to a common-property wall.
  • Who pays. For upgrade works that mainly benefit some lots, fees have to be levied so that the lot which benefits more pays more.

You may have read that owners corporations can’t refuse green upgrades on looks alone. Section 138B does restrict rules that unreasonably ban sustainability items fixed to the outside of a lot, yet the Act’s own examples (solar panels, solar hot water, roof colours) don’t include EV chargers, and a car-park charger usually relies on common property anyway. We wouldn’t count on it.

A state government guide on making owners corporations EV-ready, published in August 2026, recommends that each one set an EV strategy. We can give a committee the technical side of that strategy: where supply for chargers would come from, how circuits would be protected and metered, and how charging would be managed so the building’s main supply isn’t overloaded. That work sits under our apartment and strata EV charging service. Newer towers built under clause J9D4 of the National Construction Code are easier again, as their car parks need distribution boards set aside for EV charging, each tied to a charging control system.

Terraces and townhouses: the run from meter to car space

Stonnington’s heritage policy prefers garages, carports and on-site car spaces at the rear of a property, or in a side setback behind the main facade. On a terrace or townhouse that can leave the meter box and the car space at opposite ends of the block. Then the job is mostly about distance: getting a dedicated circuit from the meter end of the house to the parking end, by way of the roof space, the subfloor or a conduit along the side path.

That route often matters more to the cost than the charger does. We check it on site before quoting: ceiling access, subfloor clearance, any concrete to cross, and where cable can be fixed without marking original brickwork. Cable is sized for the length of the run, so a long route can also mean a heavier cable.

The switchboard comes next. A charger circuit needs its own protection, including a safety switch of a type suited to EV charging, and an older board without the room or capacity for that will need work first, which is what our switchboard upgrade service for EV chargers is for.

EV charger installation South Yarra: a compact wall charger in the rear car space of a Victorian terrace
A rear-wall charger keeps the equipment out of view from the street. AI-generated image.

Heritage streets on both sides of Punt Road

Punt Road splits South Yarra between two councils. Roughly 70% of the suburb by area is in the City of Stonnington, east of Punt Road, and roughly 30% is in the City of Melbourne to the west. Which side you’re on decides whose rules apply, so it’s one of the first things we confirm.

On the Stonnington side, Council’s Electric Vehicle Charging Infrastructure Policy, adopted in December 2022, says that charging equipment installed inside a private residence, exclusively for private use, “will not necessarily require advice or approval from Council”. Visibility is the catch. Where charging equipment can be seen from the street, the policy warns it may have implications for heritage streetscapes and says to seek advice from Council’s Statutory Planning Unit.

More South Yarra streets may soon carry heritage controls. Stonnington’s South Yarra Heritage Review (Amendment C350ston) went to an independent panel in September 2026 and is not yet in force. Its proposed precincts include:

  • Fawkner Street and Davis Avenue, a mostly 1880s subdivision with a large collection of Victorian-style houses
  • Moore, Hardy and Osborne Streets, where modest Victorian and Edwardian cottages line narrow streets
  • Alexandra Avenue, dominated by three- and four-storey interwar brick blocks of flats
  • Lechlade, Como and Fulham Avenues near Como House, where the proposed statement says later garages and carports don’t contribute to the precinct’s significance

Our view is simple: the easiest heritage approval is the one you never need. Mount the charger inside the garage, or on a side or rear wall hidden from the street, and most of these questions never come up. West of Punt Road, we check the City of Melbourne’s requirements for the address before anything is fixed to a wall.

The local process: approvals, network and paperwork

Here is how a South Yarra job usually runs. A simple house install skips a step or two; an apartment or a supply upgrade adds time.

  1. First call. Let us know the car model, where it’s parked overnight and whether you already own a charger, for example one from your dealer.
  2. Site visit. An electrician comes over from Toorak Road to look at the switchboard, meter, parking and likely cable route.
  3. Supply check. We work out your spare capacity and whether CitiPower needs to be involved.
  4. Sign-offs. Owners corporation approval for apartments, and heritage advice if the charger will be visible from the street.
  5. Quote. A written scope covering the charger, the circuit, any switchboard work and the cable route.
  6. Installation. A dedicated circuit from the switchboard, the right protection, the charger itself and tidy cable management.
  7. Testing. Victorian electricians must complete six mandatory tests plus a visual inspection, one of which checks that the safety switch operates.
  8. Certificate. We complete a Certificate of Electrical Safety and give you your copy.
How a South Yarra charger job runs: from first call to the Certificate of Electrical Safety
Diagram: DUKE EV

The sign-offs are where South Yarra jobs differ most from a suburban garage install:

Sign-off When it applies Who is involved
Owners corporation decision Works on or through common property Your owners corporation, with technical detail from us
Heritage advice A charger visible from the street in a heritage area Stonnington’s Statutory Planning Unit, or the City of Melbourne west of Punt Road
Supply alteration A bigger supply, such as single-phase to three-phase CitiPower, through an application only a registered electrical contractor can lodge
Certificate of Electrical Safety Every installation Completed by us, with a copy to you

Cost drivers for a South Yarra charger

South Yarra 3141 is supplied by CitiPower. A single-phase home suits a 7 kW charger, and CitiPower’s electric vehicle charging guide points out that a 22 kW home unit only works with three-phase power, so it isn’t an option for every home.

We don’t publish prices, because two South Yarra jobs that look alike can cost quite differently. These are the things that move the number:

  • cable run length, and whether the route goes through a roof space, under a floor or across a basement ceiling
  • switchboard capacity and condition, including room for new protection devices
  • supply type, including whether moving to three-phase power is part of the job
  • core drilling through concrete, or trenching across a courtyard
  • network applications and owners corporation requirements
  • the charger model, from simple units to smart chargers with scheduling and solar-aware modes
Wall-mounted charger, sub-board and ceiling cable tray beside a bay in an apartment basement car park
Basement installs depend on the cable route back to the switch room. AI-generated image.

Frequently asked questions on South Yarra apartments, terraces and approvals

Do I need council approval for a home EV charger in South Yarra?

Often not. For a private charger at a private home, Stonnington’s policy says Council advice or approval isn’t necessarily required, and visibility from the street is the trigger to watch in heritage areas. Addresses west of Punt Road come under the City of Melbourne instead.

Can I put a charger on my car space in an apartment building?

Often, yes, but bring the owners corporation in early, because the supply and cable route usually cross common property. We can prepare the technical detail a committee needs to make its decision.

Will I need three-phase power for an EV charger?

For most single-car homes, we don’t think so. Three-phase pays off when you want a higher-output charger and your car can use it, and the alteration is then lodged with CitiPower by a registered electrical contractor.

My dealer supplied a wall charger with the car. Can you fit it?

Yes. We fit dealer-supplied and separately bought chargers, once we’ve checked the unit suits your supply, your switchboard and the wall it’s going on.

Which certificate covers the work once the charger is in?

A Certificate of Electrical Safety for the work, completed by us as the registered electrical contractor. If your supply was altered, CitiPower also needs that certificate before it connects the new supply.

If you’re weighing up a charger in South Yarra, call 1300 003 853 (Monday to Saturday, 7am to 7pm) or send the car model and parking setup through our contact page, and we’ll arrange a site visit. We’re on Toorak Road, rarely more than a few minutes away, and all work is carried out under REC 35838.

Our South Yarra premises

128 Toorak Rd, South Yarra VIC 3141

1300 003 853

Monday to Saturday, 7am to 7pm. Closed Sunday.

Also serving: Toorak, Windsor, Prahran, Armadale, Malvern

Get directions

Why choose DUKE EV

Licensed in Victoria

Every Victorian install is done by our A-grade electricians under REC 35838, then tested and certified.

Any charger, done properly

We supply and install, or fit the charger your dealer already supplied.

Supply checked first

We check your switchboard and supply capacity before we quote, so the day goes to plan.

Clear, itemised quotes

You see exactly what you are paying for: cable run, protection, charger and certificate.

What DUKE Electrical Group clients say

The team really saved the day. I called them and they were still setting up the new office but still dropped everything to help me with my switchboard which kept tripping. They were out within a few hours and fixed the problem. Very appreciated!
S Handley
DUKE Electrical Group client
These guys really know their stuff. Very impressed with their knowledge and how quickly they could troubleshoot our home automation issue.
Anonymous
DUKE Electrical Group client
Such a friendly team. We only had a smallish job with getting new lights fitted but they treated us like we were spending a million dollars. So easy to deal with. Thanks Duke team!
A Simpson
DUKE Electrical Group client
Call now: 1300 003 853