DUKE EV · DUKE Electrical Group

EV Charger Installation Hawthorn

Close to half of Hawthorn sits in a Heritage Overlay and most homes are apartments. We keep chargers out of street view where we can and work through owners corporations with you.
Served from
Our South Yarra premises, 128 Toorak Rd
Council
City of Boroondara
Network
CitiPower
Licence
REC 35838 (VIC)

Request a quote

Close to half of Hawthorn’s land area sits inside a Heritage Overlay, measured against the state’s Vicmap planning layers. That single fact shapes almost any EV charger installation Hawthorn owners are planning, because the planning rule for chargers in an overlay turns on one thing: whether the charger can be seen from the street or a park.

We reach Hawthorn from our South Yarra premises at 128 Toorak Rd, about 4 km south-west of central Hawthorn, and our Victorian registration as an electrical contractor is REC 35838. We install chargers we supply and chargers you have already bought, and we look after the switchboard and supply work that sits behind them.

EV charger installation Hawthorn: the heritage question first

Clause 43.01 of the Boroondara Planning Scheme is the Heritage Overlay. It requires a planning permit for an electric vehicle charging station if the charging station is visible from a street (other than a lane) or a public park. You can read the wording yourself in Clause 43.01 of the planning scheme. Where no provision asks for a permit specifically, Clause 62.02-2 lifts the scheme’s buildings-and-works permit requirements for a charging station.

Two details make the overlay rule easier to live with. A charging station is listed as a VicSmart class of application, the state’s streamlined permit track. And Clause 43.01-4 exempts a charging station application from public notice and from third-party review, so neighbours cannot appeal it.

Hawthorn’s precincts are large. The West Hawthorn Precinct (HO220) takes in streets such as Barton Street, College Street, Creswick Street and Lennox Street. The Grace Park and Hawthorn Grove Precincts (HO152) cover Chrystobel Crescent, Kinkora Road and Hawthorn Grove. There is also the St James Park Estate (HO163), Central Gardens (HO146), Glenferrie Hill (HO149), Fairview Park (HO148) and the Leslie Street, Urquhart Estate and Oxley Road group (HO164). Boroondara’s heritage overlay and grading map shows whether a house is graded significant, contributory or non-contributory, though council notes it is a guide and not formal planning advice.

If solar is on your list as well, check the schedule closely. For every precinct named above, Boroondara’s schedule switches on solar energy system controls, which means panels visible from a street or public park also need a permit there. We would rather plan the panels and the charger together than discover the second permit halfway through.

Laneways, side paths and what the street can see

The words “other than a lane” are, in our view, the most useful part of the overlay for Hawthorn owners. A charger on a rear garage that opens onto a laneway is not visible from a street in the sense the clause uses, so that clause does not call for a permit. Put the same charger on the front of a carport facing the street and it does.

Take a typical single-fronted Victorian cottage in West Hawthorn with no driveway at all. There may be nowhere to put a charger that a car can reach. Now take a Federation villa off Kinkora Road with a side driveway running past the house to a garage at the back. The charger can usually go inside the garage or on its side wall, out of sight, and the permit question falls away.

Boroondara’s local heritage policy, Clause 15.03-1L, pushes the same way. It asks that vehicle accommodation and services do not dominate heritage places, and it supports equipment in areas visible from the street only where it will not detract from the place. One line deserves attention: its policy guidelines say vegetation and fences should not be treated as permanent screening when council judges whether an addition to a significant or contributory place is visible from the street. We take the same cautious view with chargers. If the only thing hiding the unit is a hedge, we assume the hedge may not be there forever.

Charger inside a rear garage off a bluestone laneway, a heritage-friendly EV charger installation Hawthorn option
A rear garage off a laneway keeps the charger out of street view. AI-generated image.

Apartments and rentals: most of Hawthorn’s homes

The houses get the attention, but they are not the majority. At the 2021 Census, 59.1% of Hawthorn’s dwellings were flats or apartments and 45.6% of households rented. The median age was 34, younger than Kew, Glen Iris or Hawthorn East. Victorian Places traces the pattern back decades: by 1981, more than 45% of Hawthorn’s housing was already flats, some carved out of larger old houses and others built where those houses once stood.

For apartment owners, the owners corporation is the first stop. Cable usually runs across common property, and the Owners Corporations Act 2006 generally requires a special resolution, backed by 75%, before an owners corporation significantly changes the use or appearance of common property. Our apartment building EV charging service page sets out what a committee needs to see, from the supply source to metering and load management.

Renters face a different first step: the owner’s written consent. We are happy to explain the work to an owner or agent in plain terms. Businesses along Glenferrie Road and Burwood Road can look at our commercial EV charger installation service for staff and customer parking. Note that the strips themselves are heritage precincts too: the Glenferrie Road Commercial Precinct (HO491) and the Auburn Village Precinct (HO260) along Auburn Road and Burwood Road. A charger on a car park wall facing the street is treated the same way as one on a house.

CitiPower, older boards and what sets the price

Hawthorn is CitiPower country. The Victorian Government’s distribution map puts virtually the whole suburb in CitiPower’s area, although CitiPower’s postcode lookup lists United Energy against 3122 as well, so we confirm the network from your meter details before lodging anything. CitiPower’s electric vehicle page describes a 7 kW wall charger as a single-phase unit that adds about 30 to 40 km of range per hour, and flags that 22 kW home units depend on three-phase power, which not every customer has.

We give written quotes rather than published prices, because the variables in Hawthorn are wide:

Factor Why it matters in Hawthorn
Switchboard An old board in a Victorian or Edwardian house may have no spare room for a new circuit or modern safety switch.
Cable route Narrow side paths, brick walls and rear garages can mean long or awkward runs.
Supply type Changing from single-phase to three-phase is an application to CitiPower lodged by a REC.
Heritage position Moving the charger out of street view can add cable length, but it can also remove the need for a permit.
Charger model Tethered or socket-only, smart scheduling and solar features vary between units.

When the board is what holds a job up, our guide to switchboard work before an EV charger goes in explains the usual fixes.

A Hawthorn job from first look to sign-off

We start with photos of the board, the meter box and the parking spot, then a site visit to measure the route and check the overlay. If a permit is needed, we tell you before anything is booked. Install day covers the dedicated circuit, the protection and the charger, followed by the testing every Victorian electrician must complete and a Certificate of Electrical Safety for your records. Energy Safe Victoria lists the mandatory checks: earthing continuity and earth resistance, insulation resistance, polarity, correct circuit connections, earth fault-loop impedance and the operation of the safety switches. None of it is optional, and none of it is skipped because a job is small.

Does a Hawthorn charger need a heritage permit? Clause 43.01 checks, in the order we run them
Diagram: DUKE EV

For a broader look at charger types, our home EV charger buying and installation guide goes further.

Charging when you can’t charge at home

About one in seven Hawthorn households had no car at all in 2021, and many apartment residents have no space of their own to wire. Boroondara lists two council-managed chargers at the Hawthorn Aquatic and Leisure Centre, 1 Grace Street, on its EV charging stations page. CitiPower’s pole-mounted charger trial, aimed at areas with high EV uptake and limited off-street parking, also lists installed sites in Hawthorn, including opposite 57 Denham Street, beside 1 Smart Street and at 25 Queens Avenue.

Frequently asked questions from Hawthorn owners and renters

Does a charger on my Hawthorn terrace need a planning permit?

A permit is needed in one situation only: the house sits in a Heritage Overlay and the charger could be seen from a street or public park. A charger facing a rear lane, or inside a garage, does not trigger the overlay. If a permit is needed, it is a VicSmart class of application with no public notice.

Our apartment building has no chargers. Where do we start?

Start with the owners corporation committee. We can assess the building’s supply and switchboard, suggest a layout for individual or shared chargers, and provide the information owners need before they vote.

I rent in Hawthorn. Is a charger still possible?

Possibly. The owner has to agree in writing first, and we can explain the work to the owner or agent. If a wall charger is ruled out, Boroondara’s chargers at the Hawthorn Aquatic and Leisure Centre and CitiPower’s pole-mounted chargers in local streets are the fallback.

Is Hawthorn on the CitiPower network?

Almost all of it. The state’s distribution map shows CitiPower across virtually the whole suburb, but the postcode lookup also lists United Energy, so we confirm it from your meter details at the first visit. We handle the network paperwork either way.

Will a heritage permit hold up my installation?

It adds a step, but a light one. A charging station application sits in the VicSmart stream and is exempt from public notice, so there is no advertising period or objection process. We prepare the photos and the charger details council needs, and we book the install once the permit is in hand.

How long does a three-phase upgrade take in Hawthorn?

CitiPower says most supply alteration works take between 3 and 8 weeks, depending on complexity. A standard single-phase charger install with no supply change is far quicker.

Whether you own a terrace in the West Hawthorn precinct or a flat near Glenferrie station, the first step is the same: a few photos and a conversation. Reach us through our contact page, or phone 1300 003 853 on any weekday or Saturday between 7am and 7pm. Next door, the streets east of Auburn Road are covered under EV charger installation in Hawthorn East, and the premises that serves you is described under EV charger installation in South Yarra.

Served from our South Yarra premises

128 Toorak Rd, South Yarra VIC 3141

1300 003 853

Monday to Saturday, 7am to 7pm. Closed Sunday.

Also serving: Toorak, Windsor, Prahran, Armadale, Malvern

Get directions

Why choose DUKE EV

Licensed in Victoria

Every Victorian install is done by our A-grade electricians under REC 35838, then tested and certified.

Any charger, done properly

We supply and install, or fit the charger your dealer already supplied.

Supply checked first

We check your switchboard and supply capacity before we quote, so the day goes to plan.

Clear, itemised quotes

You see exactly what you are paying for: cable run, protection, charger and certificate.

What DUKE Electrical Group clients say

The team really saved the day. I called them and they were still setting up the new office but still dropped everything to help me with my switchboard which kept tripping. They were out within a few hours and fixed the problem. Very appreciated!
S Handley
DUKE Electrical Group client
These guys really know their stuff. Very impressed with their knowledge and how quickly they could troubleshoot our home automation issue.
Anonymous
DUKE Electrical Group client
Such a friendly team. We only had a smallish job with getting new lights fitted but they treated us like we were spending a million dollars. So easy to deal with. Thanks Duke team!
A Simpson
DUKE Electrical Group client
Call now: 1300 003 853