Unlike Mont Albert, Surrey Hills, Blackburn or Burwood, Box Hill is a suburb where the typical home is an apartment. At the 2021 Census, 53.1 per cent of occupied dwellings were flats or apartments, 57.9 per cent were rented and 23.4 per cent of households had no car at all. That changes what EV charger installation Box Hill work looks like. Most of it is about buildings: basement car parks, shared switchboards, owners corporations and the network capacity sitting behind them.
Box Hill is about 12 km from our South Yarra premises on Toorak Road, and we serve it from there. Our A-grade electricians install single chargers for individual owners, plan building-wide systems for owners corporations, and fit chargers at houses, townhouses and businesses right across the suburb.
EV charger installation Box Hill: start with the building
| Home type | Share of Box Hill homes (2021 Census) | Usual starting point for a charger |
|---|---|---|
| Flat or apartment | 53.1% | Owners corporation approval, then a circuit from the building’s supply to your car space |
| Townhouse, semi or terrace | 24.7% | Your own switchboard, plus common property consent if cable crosses a shared area |
| Separate house | 22.0% | A standard home install from your switchboard to the garage or carport |
United Energy owns the poles and wires across the whole suburb, and its December 2025 planning report expects maximum demand in the Box Hill and Doncaster Hill areas to keep growing steadily over the coming years. For one charger in one car space, that is background noise. For a building adding dozens of chargers, it is one reason we begin with a load assessment. Size matters as well: once a site needs 170 amps or more, United Energy typically handles it as a negotiated connection under its rules for new and upgraded supplies.
What the owners corporation decides
If your car space is in a shared basement, the cable from the building’s supply to your bay usually crosses common property, which puts the decision with the owners corporation. The Owners Corporations Act 2006 has no EV-specific rules, which means the ordinary machinery applies:
- Changing how common property is used or how it looks, in a significant way, generally takes a special resolution: 75 per cent of lot entitlements when a ballot or poll is used, or 75 per cent of votes otherwise.
- If a vote falls short of that, it can still pass as an interim special resolution: at least half of the total votes for all lots in favour and no more than a quarter of those votes against. It becomes a special resolution 29 days later unless owners holding more than 25 per cent of the total votes petition against it.
- Upgrade works can be levied across lots, but where works mainly benefit some lots, the lots that benefit more pay more.
- A building that sells charging electricity to residents is covered by a deemed exemption under the Essential Services Commission’s exemption rules, with yearly reporting to the Commission in place of a retail licence.
How each kind of resolution is counted is set out in Consumer Affairs Victoria’s guide to owners corporation voting. The Victorian Government also released an EV-ready guide for owners corporations in August 2026, which encourages each building to set its own EV strategy instead of assuming one solution fits every car park.
What a load study looks at
We start with the building’s main switchboard rating and the maximum demand it actually sees, then count the car spaces likely to want charging over the next few years. The National Construction Code’s EV rules for new apartment buildings use a benchmark of circuits able to support a charger delivering at least 12 kWh between 11 pm and 7 am, which is a useful yardstick for older buildings too. From there we work out how many bays the existing supply can carry with load management, and when an upgrade application to United Energy makes more sense.
Metering each bay
There are two common ways to pay for charging in a shared car park. Each charger can be wired back to its lot owner’s own meter, which suits a handful of bays close to the meter room. Or the building can supply every bay from common property, measure each one with a sub-meter or the charger’s own metering, and recover the cost from residents. The second option scales better, and it is where the Essential Services Commission’s exemption comes in.
Our job is to give the committee something it can actually vote on: a load study, a marked-up car park plan, the scope of works and the options for metering each bay. We would argue a whole-of-car-park plan beats one-off approvals every time. Piecemeal chargers tend to use up the building’s spare capacity on a first-come basis, and the last owners to ask end up with the hardest and dearest job. Both approaches, including load management that lets a building add bays over time, sit within our apartment and strata EV charging work.
Renting in Box Hill
With almost six in ten households renting, a lot of would-be EV drivers here do not own the wall they want to drill into. A fixed charger needs the owner’s agreement and, in an apartment, the owners corporation’s as well. We can give your rental provider a clear written scope and quote to approve, which takes the guesswork out of saying yes.
If a fixed charger is not on the cards yet, United Energy’s guidance is that charging from a regular outlet suits drivers covering up to 200 km a week. For a short commute that can carry you while the building works through its plans. Just skip the double adaptors and daisy-chained extension leads, which United Energy specifically warns against.

Townhouses and houses near Combarton Street and Alexander Street
Almost half of Box Hill’s homes are houses or townhouses, and their chargers look much like anywhere else in the eastern suburbs. The exception is heritage. The Combarton Street and Alexander Street precincts both sit under a Heritage Overlay with external paint controls, and Box Hill Cemetery on Middleborough Road and Box Hill High School on Whitehorse Road are individually listed.
Within those overlays the planning trigger is sightlines. Put the charger where the street and any public park cannot see it and no permit is needed; if it has to be visible from the street, the permit goes through VicSmart. Outside heritage areas, clause 62.02-2 generally takes chargers out of the buildings-and-works permit system. The rest of the process follows our home EV charger installation steps, and owners further east can compare notes on our Blackburn EV charger installation page, where trees matter more than heritage.
Shops, clinics and workplaces
Box Hill is also a place where people work. The Whitehorse Planning Scheme names Box Hill Hospital as part of a designated Education and Health Precinct, and Epworth Eastern, Box Hill Institute and Box Hill Central are all in the suburb too. A staff car parked for a full shift suits an AC charger well, with load management spreading the site’s spare capacity across every bay in use.
For a business, the decisions are access control, billing and how the chargers are managed. Chargers that speak OCPP, the open communication protocol between charge points and management software, keep you free to change software providers later. Our commercial EV charger installation and fleet and workplace EV charging teams plan these jobs around how the site actually runs.
The Suburban Rail Loop and the car parks still to come
SRL East will run from Cheltenham to Box Hill. Construction began in June 2022, and the government projects trains running by 2035. Whitehorse City Council’s Suburban Rail Loop updates track the structure planning around the Box Hill and Burwood stations, which the State Government first released in draft in March 2025.
The planning controls that followed matter for anyone building here. In July 2026, Amendment C255whse put the Box Hill SRL East Structure Plan into the Whitehorse Planning Scheme, and its Parking Overlay for the Box Hill Structure Plan Area asks for a car parking plan that shows any spaces allocated to electric vehicle charging, and says car parks should allow for dedicated charging and car share spaces. In some land categories, new dwellings have no minimum parking at all and a maximum of 0.8 spaces each. Fewer bays means each one works harder, and the build stage is the easiest moment to put in conduit, switchboard space and load management for every one of them.
Frequently asked questions about apartment and workplace charging in Box Hill
Can I install a charger in my apartment car space without asking the owners corporation?
Usually not. The cable from the building’s supply to your bay generally crosses common property, so the owners corporation has to approve the work first. We can prepare the scope and drawings for that decision.
Who pays for the electricity my charger uses in a shared car park?
It depends on the wiring. Wired to your own meter, the charging simply appears on your own electricity bill. On a building-run system, the owners corporation measures each bay and passes the cost on to you.
Is there enough network capacity for a whole building of chargers?
There may be enough for a managed system even where there is not enough for every charger at full power at once. A load study tells us what spare capacity exists, load management shares it between bays, and if more supply is needed we apply to United Energy for an upgrade.
I rent an apartment in Box Hill. Where do I start?
Talk to your rental provider first, then ask whether the owners corporation already has an EV plan. We can give both a written scope, and in the meantime a regular outlet may cover a short weekly commute.
Do you install chargers for clinics, offices and shops?
Yes. We plan and install workplace, customer and fleet chargers, including load management, access control and billing, around the way each site runs.
Whether it is one bay or a whole basement, start by describing the car park through our contact page for an EV charging quote, or call us on 1300 003 853 from Monday to Saturday, 7am until 7pm. For the committee’s records, our Victorian registered electrical contractor number is REC 35838. Townhouse owners just west of here may find our Mont Albert charger installation page useful too.