DUKE EV · DUKE Electrical Group

EV Charger Installation Cheltenham

Chargers for Cheltenham houses, townhouses and apartments on both sides of the Kingston and Bayside line, installed by our A-grade electricians from Charman Road, Beaumaris.
Served from
Our Beaumaris premises, 125 Charman Rd
Council
City of Kingston and Bayside City Council
Network
United Energy
Licence
REC 35838 (VIC)

Request a quote

Cheltenham sits across two councils and two quite different kinds of housing, and both shape EV charger installation Cheltenham jobs from the first phone call. Vicmap’s address data puts about four in five Cheltenham addresses in the City of Kingston. The rest, around Bay Road, Weatherall Road, Reserve Road and the Park Road side of Cheltenham Park, belong to Bayside City Council. Then there is the housing split: freestanding houses in the established streets on one hand, and on the other a Suburban Rail Loop precinct where controls introduced in July 2026 allow mid-rise and taller apartment buildings.

We look after Cheltenham from our Beaumaris premises at 125 Charman Rd, about 2 km from the centre of the suburb and on the same road as Cheltenham Primary School. Our A-grade electricians do the lot: checking the switchboard and supply, fitting a charger we supply or one you already own (a unit from your car dealer is fine), testing, and the paperwork that follows.

EV charger installation Cheltenham: what we check first

Every Cheltenham quote starts with the same five questions, because they decide the cable route, the protection and whether anyone else has to approve the work.

  • Which council, and is there an overlay? Kingston or Bayside, and whether a Heritage Overlay applies to the property.
  • Where does the car actually sit? Garage, carport, open driveway or a basement space.
  • How far is that from the switchboard? Cable length and the path it has to take drive most of the cost.
  • Does the switchboard have room? Space for a new circuit, and protection that suits an EV charger.
  • Single-phase or three-phase supply? That sets the realistic charging speed.

The local numbers explain why the second and last questions matter so much. In the 2021 Census, 58.5% of occupied Cheltenham dwellings were separate houses, 22.7% were townhouses or similar and 18.5% were flats or apartments. Just over half of households had two or more vehicles. Once a second EV turns up, a circuit sized for one car can need load management or a supply rethink, so we plan for that on day one rather than after the fact.

Kingston streets and Bayside streets follow different heritage lists

For most Cheltenham homes a charger does not need a planning permit. Clause 62.02-2 of the Victorian planning schemes lists an electric vehicle charging station among the works exempt from buildings-and-works permits, unless another control specifically requires one. The Heritage Overlay is the control that does. Under clause 43.01-1, a charging station on a heritage-listed property needs a permit if it is visible from a street (other than a lane) or a public park. Those applications are exempt from the notice and third-party review provisions, which keeps them simpler, but a permit is still an extra step before installation.

Which list applies depends on your side of the council line. Kingston’s Heritage Overlay schedule names 11 Cheltenham places, among them the Court House at 1222 Nepean Highway, the Tudor Inn at 1281 Nepean Highway, St Matthews Anglican Church on Park Road and the war memorials on Centre Dandenong Road. Bayside’s list for its part of the suburb is longer: Cheltenham Primary School and the old cemetery on Charman Road, houses on Glebe Avenue and Park Road, and two post-war modern houses on Fairway Avenue and Olympic Avenue added through Amendment C192bays in October 2025.

On the Bayside side there is a further local policy: clause 15.03-1L wants satellite dishes, air conditioning plants, solar heating systems and similar services concealed from the street. It does not mention chargers, but we follow the same logic, starting with spots inside the garage, under the carport roof or on a wall well back from the frontage.

EV charger installation Cheltenham example: a wall charger under a carport beside a side driveway
A carport charger with its conduit run along a side driveway. AI-generated image.

Post-war houses, carports and long side driveways

In the established streets, a common arrangement puts the switchboard near the front of the house and the car under a carport or in a garage towards the back of the block. That distance is the biggest single variable in the job. On a block like that the cable can easily run 20 or 30 metres along the side of the house, and it has to be sized for the length. A typical 32 A single-phase charger usually needs 6 mm² cable, and long runs can call for larger conductors such as 10 mm².

Then there is the switchboard. Older boards often lack room for a dedicated circuit, and some carry protection that does not suit EV charging. Since 1 May 2023 the Wiring Rules have not allowed Type AC safety switches in new work; they can fail to detect the pulsating DC faults that devices such as EV chargers can introduce. We fit a Type A or Type B device to match the charger, depending on whether the unit has its own DC fault detection. Where a board is full or tired, our switchboard upgrades for EV chargers can be planned into the same job.

Carports add one more consideration. The charger lives outdoors, so we choose a weather-rated unit and fixings, and keep the cable clear of where cars, bins and mowers go.

Apartments, townhouses and the Suburban Rail Loop precinct

Amendment GC246 came into effect on 1 July 2026 to implement the Cheltenham SRL East Structure Plan. Its new Built Form Overlays support “mid to high-rise built form” in the central core, taller mid-rise buildings along the Nepean Highway and Chesterville Road corridors, and mid-rise housing in a garden setting in the residential neighbourhoods around them. The companion Parking Overlay caps new dwellings in its Area A at one car space each, and in most of its parking categories removes the minimum altogether.

For charging, that changes the maths. When a building has fewer car spaces than apartments, each space is valuable and charging has to be planned as shared infrastructure rather than a one-off favour for whoever asks first. The National Construction Code’s J9D4 provisions require car parks in new apartment buildings to include distribution boards dedicated to EV charging and a charging control system, although not the chargers themselves. In an existing block, changing the use or appearance of common property in a significant way generally needs a special resolution of the owners corporation (section 52 of the Owners Corporations Act 2006).

We prepare what a committee needs to decide: a load assessment of the building’s supply, a cable route, and a plan for how each user’s charging is metered or allocated. Our apartment and strata EV charging service covers that process in detail, and the planning documents sit on the state’s page for Amendment GC246.

Three Cheltenham properties, three charging plans: how the property type changes the job
Diagram: DUKE EV

United Energy’s side of a Cheltenham install

The postcode locator data published by CitiPower and Powercor lists Cheltenham, postcode 3192, under United Energy. Its rules say a registered electrical contractor must install wall and fast chargers and lodge them on the myEnergy portal, and it notes that some homes need a power supply upgrade to cope with the extra load. We handle the registration as part of the job; United Energy’s own guidance is on its electric vehicle charging page.

Speed is where expectations need a reality check. A 32 A charger on single-phase supply delivers about 7.4 kW. Three-phase allows roughly 11 kW at 16 A per phase, or about 22 kW at 32 A, and United Energy notes that a typical 22 kW charger requires three-phase power. Whatever the wall box can supply, the car’s own onboard charger decides how fast AC charging actually runs, and not every car can use 22 kW. Before a 32 A single-phase unit goes in, we also confirm what the network expects, because the Victorian Service and Installation Rules give advisory figures for big single-phase loads.

Our view: for a Cheltenham house with one or two commuting cars, a 7 kW single-phase charger on a properly sized circuit is the sensible default. Three-phase earns its keep for heavy daily driving or two long-range EVs charging overnight, and we will say plainly when it doesn’t. If you have rooftop panels, our solar-aware charging set-ups let a smart charger follow the solar output through the day.

The site visit, the testing and the certificate

For a house the process is short. We visit from Beaumaris, look at the switchboard, meter and parking spot, and quote with the cable route spelled out. On install day the circuit goes in, the charger is mounted and configured, and the work is tested. Energy Safe Victoria lists six mandatory tests after electrical installation work, including the operation of safety switches. You then receive a Certificate of Electrical Safety from us, a registered electrical contractor (REC 35838); Energy Safe Victoria’s certificate guide explains what it records.

If your dealer supplied the charger, the steps are the same and we simply install your unit. For a wider look at options for a freestanding home, our home EV charger installation page sets out charger types and circuit choices.

Frequently asked questions for Cheltenham households

Is a charger in Cheltenham exempt from planning permits?

Usually, yes. Clause 62.02-2 exempts an electric vehicle charging station from buildings-and-works permits unless another control specifically requires one. The main exception is a heritage-listed property where the charger would be visible from a street (other than a lane) or a public park.

How do I know whether my street is Kingston or Bayside?

Your rates notice will say. As a rough guide, the streets around Bay Road, Weatherall Road, Reserve Road and Tulip Grove are Bayside, while the Nepean Highway, Station Road, Chesterville Road and Centre Dandenong Road side of the suburb is Kingston.

Can you install a wall box I bought online or through my dealer?

Yes. We check the model and its installation manual against your switchboard and supply before install day, then fit it as we would one of our own.

Can my apartment’s basement car space have a charger?

Often, yes, but the owners corporation has to be involved because the cable will cross common property. We assess the building’s spare capacity, map a route from a suitable distribution board, and give the committee a written proposal.

Who is the electricity distributor for Cheltenham?

United Energy, according to the distributors’ postcode locator for 3192. We register your charger with United Energy through myEnergy as part of the installation.

Whether the car lives under a carport off Weatherall Road or in a basement near Chesterville Road, the starting point is a site visit and a clear quote. Book through our contact page or call 1300 003 853, Monday to Saturday, 7am to 7pm. You can also read about our base on the Beaumaris EV charger page, or see how we approach heritage streets in neighbouring Mentone homes and units.

Served from our Beaumaris premises

125 Charman Rd, Beaumaris VIC 3193

1300 003 853

Monday to Saturday, 7am to 7pm. Closed Sunday.

Also serving: Black Rock, Sandringham, Cheltenham, Mentone, Mordialloc

Get directions

Why choose DUKE EV

Licensed in Victoria

Every Victorian install is done by our A-grade electricians under REC 35838, then tested and certified.

Any charger, done properly

We supply and install, or fit the charger your dealer already supplied.

Supply checked first

We check your switchboard and supply capacity before we quote, so the day goes to plan.

Clear, itemised quotes

You see exactly what you are paying for: cable run, protection, charger and certificate.

What DUKE Electrical Group clients say

The team really saved the day. I called them and they were still setting up the new office but still dropped everything to help me with my switchboard which kept tripping. They were out within a few hours and fixed the problem. Very appreciated!
S Handley
DUKE Electrical Group client
These guys really know their stuff. Very impressed with their knowledge and how quickly they could troubleshoot our home automation issue.
Anonymous
DUKE Electrical Group client
Such a friendly team. We only had a smallish job with getting new lights fitted but they treated us like we were spending a million dollars. So easy to deal with. Thanks Duke team!
A Simpson
DUKE Electrical Group client
Call now: 1300 003 853