More than 90% of Black Rock sits under a single planning control: the Vegetation Protection Overlay for the Beaumaris and Black Rock native vegetation areas. It protects the coast banksias, tea-trees, casuarinas and gums that give the suburb its look, and it shapes EV charger installation Black Rock homes need in a very practical way. Where the cable goes matters as much as where the charger hangs.
DUKE EV handles electric vehicle charging for DUKE Electrical Group, under Registered Electrical Contractor number REC 35838 in Victoria. The electricians who look after Black Rock are based at DUKE’s Beaumaris premises, 125 Charman Rd, about 3 km east of the suburb’s centre, so the streets between Bluff Road, Balcombe Road and the Royal Melbourne Golf Club are close to our base. Our work there covers new chargers, ones you bought with the car, and the switchboard, supply, solar and load-management work behind them.
EV charger installation Black Rock under the vegetation overlay
Schedule 3 to the overlay is short and firm. A permit is required to remove, destroy or lop any vegetation native to Australia, with two exemptions: plants under 2 metres high or with a single trunk circumference under 0.5 metres at 1 metre above the ground, and pruning of branches that overhang an existing dwelling or come within 2 metres of it. The schedule names species such as Coast Banksia, Coast Tea-tree, Drooping Casuarina and Coast Manna Gum, and Bayside’s planning scheme says it wants significant vegetation retained “particularly in Beaumaris and Black Rock”. You can read the overlay in Clause 42.02 of the Bayside Planning Scheme.
For a charger job that translates into a few habits:
- We plan the cable route before anything else, and favour surface conduit along walls, eaves and fences over a trench through the garden.
- Where a trench is the only sensible route, we lay it out to stay clear of the trunks and canopy of native trees.
- If a route would mean lopping or removing a native tree that is not exempt, the permit question comes first, before any work is booked.
- On the foreshore side of Beach Road, parts of the suburb are also in the Erosion Management Overlay, where earthworks on unstable slopes call for extra care, so digging is kept to the minimum there as well.
The overlay is not the only tree rule. Since September 2025, statewide canopy tree controls can also bring in a permit for cutting back or taking out a big tree close to the front or rear boundary of a house lot, native or not. Between the two, a cable route that leaves every tree alone is the simplest one to approve.
We would rather run a few extra metres of cable around a banksia than ask council to let us lop it. It is usually the faster job, and the tree is still there afterwards.
Carports and the October 2025 heritage listings
Black Rock’s older heritage listings include Black Rock House on Ebden Avenue and the Black Rock Baby Health Centre building on Bluff Road. In October 2025 some newer houses joined them. The post-war modern heritage amendment, C192bays, added 50 individual places and a group listing to Bayside’s Heritage Overlay; three are in Black Rock, and for two of them the schedule specifically names the carport.
That matters for chargers. Clause 43.01 treats a wall box like other visible services: if people can see it from a street or public park, it needs a VicSmart planning permit, though not public notice, and laneway views are excluded. A charger fixed to a carport that is part of a listing is exactly the kind of change a planner will look at closely. If your house is on the list, we would look first at the garage interior, a rear wall or a spot that cannot be seen from the street, and only then at the carport.
Most Black Rock homes are not heritage-listed at all, and for them the vegetation overlay is the planning issue that comes up.

Solar first: charging from the roof in Black Rock
A charger and a solar system work best when they talk to each other. Solar Victoria’s EV-ready home guide describes the basic idea: set a smart charger to run while the panels are producing. There are trade-offs. Energy sent to the car during the day is energy the house cannot use that evening, a home battery lets you bank daytime solar for charging after dark, and a modest system may not refill an empty car battery in one day, although it copes well with daily top-ups.
The network side matters too. United Energy’s 2022 installer FAQ says its standard offer covers solar systems up to 10 kVA with 5 kVA of export on a single-phase site, or 30 kVA with 15 kVA of export on a three-phase site. New, upgraded or replacement solar systems in Victoria must also comply with the emergency backstop mechanism, which lets generation be reduced during minimum system load events. Steering surplus solar into the car, rather than exporting it, sits neatly inside those limits.
Here is how a sunny day’s output is shared when the charger is set to follow the solar:
Our solar EV charger installation service sets up the charger, the energy meter at the switchboard and the solar-tracking mode, whether the panels are new or have been on the roof for years.
Townhouses, two-car households and the driveway
Black Rock has a surprising share of townhouses. At the 2021 Census, 34.2% of occupied homes were semi-detached houses or townhouses, compared with 13.9% statewide. Separate houses made up 56.0% and flats or apartments 8.0%. Households here also run plenty of cars: 43.8% had two vehicles and 17.7% had three or more, while just 3.1% had none.
Take a front-and-rear pair of townhouses built on a subdivided lot. The electrical side is usually simple because each home tends to have its own meter and switchboard, but the rear home’s car space can sit well away from its meter, and the cable may have to follow a shared driveway. Keeping that route inside your own lot avoids an owners corporation discussion, and it is worth checking the title plan before deciding where the charger goes.
Two-EV households have the same choice they have anywhere: share one charger, fit two with load sharing, or add dynamic load management at the switchboard. Where the house is already busy with a pool pump, heating and a large kitchen, a three-phase power upgrade can be the cleaner fix. For a single car on a standard supply, the simpler path is set out on our home EV charger installation page.
Almost half of Black Rock homes (49.6%) were owned outright at the 2021 Census. If you are staying put, it is worth planning the charger, the solar and any future battery together rather than one at a time, so the switchboard and cabling are only opened up once.
Public charging at the Balcombe Road car park
Black Rock was first off the mark in Bayside City Council’s public charging rollout. A 50 kW DC fast charger was installed in one bay of the public car park at 588 Balcombe Road in November 2024, close to Black Rock Village; the details are on the council’s EV charger project page. It suits a top-up while you are at the shops or down at the beach. For everyday driving, a charger at home, ideally running on your own solar, does the real work.
United Energy is the electricity distributor for Black Rock. Its EV charging guidance points out that some chargers can talk to the grid and adjust their charging rate as network conditions change, and wall chargers on its network must be fitted by a REC and recorded in myEnergy. We lodge that on every job, and a Certificate of Electrical Safety is handed over when the work is finished.
Frequently asked questions on charging in Black Rock
Do I need a permit to run a cable past a native tree?
Not if the route leaves the tree alone. The Vegetation Protection Overlay is about removing, destroying or lopping native vegetation, so a route that avoids doing that, or only affects plants under the overlay’s size thresholds, needs no permit under it. Digging through a tree’s roots is less clear-cut, so we keep trenches well away or check with Council first. The statewide canopy tree rules can also catch a large tree close to the street frontage or rear boundary, so we design the route to stay clear of protected trees.
Our carport is part of a heritage listing. Can a charger go there?
Possibly, but it is the spot that needs the most thought. If passers-by on the street or in a park could see it, you need a VicSmart permit before installation. We usually suggest a less prominent position before settling on the carport.
Can the charger run only on solar?
Yes, if the charger supports a solar-only mode and an energy meter is fitted at the switchboard. Expect slower charging on cloudy days, so it is sensible to keep a scheduled overnight top-up as a back-up.
Which electricity network covers Black Rock?
United Energy. Solar export limits, supply upgrades and charger registration all go through United Energy, and we manage those applications for you.
Where does your Black Rock electrician come from?
Our electricians work from DUKE’s Beaumaris premises at 125 Charman Rd, about 3 km from the centre of Black Rock. There is more about that base on our Beaumaris EV charger installation page.
From one wall box in a townhouse garage to a solar-led setup for a two-EV household, the first step is a site visit to look at the switchboard, the cable route and the trees in its way. Call 1300 003 853 any day but Sunday, 7am to 7pm, or arrange it through our contact page for a written quote. Next door, the EV charger installation in Sandringham page deals with that suburb’s apartment blocks and heritage houses.