DUKE EV · DUKE Electrical Group

EV Charger Installation St Kilda

Most St Kilda homes are flats, so a charger usually means owners corporation sign-off, a check on which of two networks supplies the building, and a heritage look. Served from South Yarra, about 3 km away.
Served from
Our South Yarra premises, 128 Toorak Rd
Council
City of Port Phillip
Network
CitiPower or United Energy (by address)
Licence
REC 35838 (VIC)

Request a quote

EV charger installation St Kilda style usually starts with a question about the building, not the car. At the 2021 Census, 79 per cent of occupied homes in St Kilda were flats or apartments, six in ten were rented and a quarter of households had no registered vehicle at all. So the first thing we ask is where the car actually sleeps, and who owns the wall beside it.

Our electricians are based at 128 Toorak Rd in South Yarra, about 3 km from the middle of St Kilda, and that crew also looks after EV charger installation in South Yarra. We hold Victorian registration as an electrical contractor (REC 35838). We supply and fit chargers, and we also install units your car dealer has already sold you. What follows is the local detail that decides a St Kilda job: owners corporations, a postcode shared by two electricity networks, heritage controls and the council’s rules for the street.

Apartment car parks and the owners corporation

In a block of flats, the car space, the wall behind it and the cable route back to the meter panel can each belong to someone different. Some car spaces are part of your lot. Others are common property, and almost every cable route crosses common property somewhere between the meter room and the parking bay.

That is why the committee usually wants the details in writing before anyone drills a hole. Bigger changes, such as a shared cable tray serving several bays, can amount to a significant alteration of common property. Section 52 of the Owners Corporations Act 2006 ties that kind of change to a special resolution, and on a ballot a special resolution means 75 per cent of lot entitlements. Consumer Affairs Victoria explains how owners corporation votes and ballots work, and it is a short read before the meeting.

Our view, for what it is worth: once three or four owners in a St Kilda block start talking about EVs, one planned supply for the whole car park is smarter than chargers added piecemeal. One backbone cable with spare capacity and load management on the building supply means one disruption instead of five, and nobody ends up with the only charger the switchboard can carry. Our apartment and strata EV charging work starts with exactly that load assessment.

If the building later bills residents for charging electricity, the Essential Services Commission’s General Exemption Order 2022 already covers it. Selling electricity to charge an EV does not need a retail licence, although sellers in that category report to the commission by 31 March each year.

One postcode, two electricity networks

St Kilda is split between two distributors. The postcode data behind CitiPower’s find your electricity distributor tool lists St Kilda under both CitiPower and United Energy. United Energy’s December 2025 planning report says its Elwood zone substation supplies parts of St Kilda. Which network feeds your building depends on the address, so we confirm it for your property before any paperwork goes in.

The network changes the paperwork more than the hardware. United Energy’s rule is that a registered electrical contractor fits the wall charger and registers it through myEnergy, the network’s online portal. On the CitiPower side, a change to the supply itself, such as moving to three-phase, is lodged by the contractor as an alteration. We do the lodging either way.

A small technical point that matters in older blocks: the Victorian Service and Installation Rules, which every Victorian distributor works to, give 20 amps as advisory guidance for a single-phase switched load. A typical 32 amp wall charger sits above that figure. It can still be installed, but we check your network’s position first instead of assuming.

EV charger installation St Kilda example: a wall charger in the rear car park of a walk-up flat block
A wall charger at a parking bay in a shared rear car park. AI-generated image.

Heritage controls on St Kilda Hill

On our rough count of the state’s planning overlay maps, more than half of St Kilda’s land area sits inside a Heritage Overlay. The largest single precinct is HO5 St Kilda Hill, which the Port Phillip Planning Scheme describes as the area generally bounded by Fitzroy Street, Barkly Street, Carlisle Street and the bay. Grey Street, Robe Street, Dalgety Street and Eildon Road all fall inside it.

Clause 43.01 of the planning scheme now names electric vehicle charging stations directly. A permit is needed when the charging station is “visible from a street (other than a lane) or public park”, in the clause’s own words. Keep it out of sight and that clause is not triggered. Where a permit is needed, the application goes through VicSmart, the state’s streamlined stream, and it is exempt from the usual neighbour notice.

Port Phillip’s local heritage policy points the same way. It encourages services and equipment to be concealed from the street, prefers vehicle access from a rear laneway and discourages new crossovers at the front of heritage properties. In practice the inside of a garage, a wall facing the lane, or a side setback behind the front façade are the natural spots. We settle the position on the site visit and tell you then if a permit looks likely.

No off-street parking: what Port Phillip allows

A lead from the front window to the kerb is out. The council’s own EV page states that running a power cord across a footpath or road breaks a Port Phillip Local Law.

Port Phillip does run a private charger model for residents without a driveway, allowing in-kerb units, gully-recessed cable channels and over-the-footpath booms. For most of St Kilda the sticking point is eligibility. The property has to be a standalone building, the applicant needs public liability insurance at the level the council sets, and tenants need the landlord’s written permission. The bay stays open to public parking, and the model runs until mid-2028 or until 100 chargers are in, whichever comes first.

So for flat dwellers, public charging is the realistic fallback for now. The council lists pole-mounted 22 kW chargers installed in early 2026 at 24 Chaucer Street and 27-31 Herbert Street. Its consultation on 32 more kerbside charging sites closed on 23 August 2026, and the council expects to publish what it heard in October 2026.

What shapes the cost of a St Kilda job

We do not publish prices, because two St Kilda installations rarely match. These are the things that move the figure:

  • Distance from the meter panel. In a walk-up block the meters can be at the front and the car park at the back. A 32 amp charger usually needs 6 mm² cable, and a long run may need heavier cable.
  • Spare capacity. Older blocks often share a modest supply across many flats, so a load check decides whether a charger fits as is or needs load management.
  • The route. Brick walls, concrete slabs and fire-rated walls between car park and stairwell take longer to cross neatly than a timber garage wall.
  • Switchboard condition. A full or tired board may need a switchboard upgrade before the charger goes in.
  • The charger itself. Tethered or socketed, basic or smart, single-phase or three-phase.
Your St Kilda set-up Who has to agree Usual charger position
House with a garage off a rear lane You, plus a heritage check if it is visible from the street Inside the garage or on the lane-side wall
Walk-up block with an open rear car park The owners corporation Wall or post at the bay, with cable run along shared walls
Newer building with a basement The owners corporation, often via the building manager Basement wall, fed from a car park distribution board
Flat with street parking only The council, if eligible at all Usually public charging instead

EV charger installation St Kilda: from site visit to certificate

Most St Kilda jobs follow the same five steps, whatever the building:

From site visit to certificate in St Kilda: The five steps behind an apartment or house charger
Diagram: DUKE EV
  1. Site visit. We look at the meter panel, the switchboard, the car space and the cable route, and photograph anything the committee will ask about.
  2. Approvals. Written sign-off from the owners corporation where it applies, and a heritage check if the charger would be visible from the street.
  3. Network. We confirm CitiPower or United Energy for the address and lodge what that network needs.
  4. Installation. A dedicated circuit with the right protection. Type AC safety switches have not been allowed in new work since 1 May 2023, partly because chargers can produce DC leakage those devices may miss.
  5. Testing and certificate. We complete the mandatory tests, including safety switch operation, and give you a Certificate of Electrical Safety.

For a house rather than a flat, our home EV charger installation page covers charger choice in more depth.

Frequently asked questions about EV charging in St Kilda

Can I run a lead from my St Kilda flat to a car parked on the street?

No. Port Phillip says a Local Law prohibits running power cords across a footpath or road. The council’s private kerbside model is limited to standalone buildings, so most flat owners rely on public chargers or a charger in a building car park.

Does my owners corporation have to approve a charger in my car space?

Usually, because the cable route almost always crosses common property. Get approval in writing first. Larger shared works can need a special resolution, so we provide the load figures and a plain-English scope for the committee.

Is my building on CitiPower or United Energy?

It depends on the address, since St Kilda is listed under both networks. CitiPower’s distributor tool shows the networks by postcode, and we confirm the exact network for your address before lodging anything.

Will a charger on a St Kilda Hill house need a planning permit?

Only where it would be on show to a street or a public park; a view from a rear lane does not count. Mounted inside a garage, or on a wall seen only from a lane, that heritage trigger does not apply. If a permit is needed, it goes through VicSmart.

Where does your team come from for St Kilda jobs?

Toorak Road, South Yarra. Our premises at number 128 is about 3 km from the centre of St Kilda. We also work right across neighbouring Elwood.

If you want a clear answer for your building, contact our team for a site visit and quote or phone 1300 003 853 (we answer from 7am to 7pm, Monday to Saturday). We will tell you early whether the owners corporation, the network or a heritage permit needs to be part of the plan.

Served from our South Yarra premises

128 Toorak Rd, South Yarra VIC 3141

1300 003 853

Monday to Saturday, 7am to 7pm. Closed Sunday.

Also serving: Toorak, Windsor, Prahran, Armadale, Malvern

Get directions

Why choose DUKE EV

Licensed in Victoria

Every Victorian install is done by our A-grade electricians under REC 35838, then tested and certified.

Any charger, done properly

We supply and install, or fit the charger your dealer already supplied.

Supply checked first

We check your switchboard and supply capacity before we quote, so the day goes to plan.

Clear, itemised quotes

You see exactly what you are paying for: cable run, protection, charger and certificate.

What DUKE Electrical Group clients say

The team really saved the day. I called them and they were still setting up the new office but still dropped everything to help me with my switchboard which kept tripping. They were out within a few hours and fixed the problem. Very appreciated!
S Handley
DUKE Electrical Group client
These guys really know their stuff. Very impressed with their knowledge and how quickly they could troubleshoot our home automation issue.
Anonymous
DUKE Electrical Group client
Such a friendly team. We only had a smallish job with getting new lights fitted but they treated us like we were spending a million dollars. So easy to deal with. Thanks Duke team!
A Simpson
DUKE Electrical Group client
Call now: 1300 003 853