Bayside’s planning scheme describes the local housing as running “from fine examples of grand period homes to older villas, modern architect designed homes and public housing”. Brighton has all of that, plus townhouses and apartment buildings, and each type asks something different of a home charger. Our electricians work from 99 Bay St, so EV charger installation Brighton-wide is local work for us. A site visit is a short drive, and so is the return trip if United Energy needs something lodged before we can finish.
DUKE EV sits within DUKE Electrical Group, which covers electrical, automation and security work across Melbourne. Our Victorian Registered Electrical Contractor number is REC 35838, and you can check it on Energy Safe Victoria’s public register. Our A-grade electricians install new chargers from us or the unit your car dealer provided, and take care of the related work: switchboard and three-phase upgrades, load management, solar-aware charging, repairs and servicing.
EV charger installation Brighton, from our Bay Street premises
Bay Street makes a practical base. By road, our premises is about 0.7 km from North Brighton station, 1.6 km from Middle Brighton station and 3.3 km from Brighton Beach station. We’re open Monday to Saturday, 7am to 7pm, and closed Sunday, so a Saturday site visit is an option if you work in the city during the week.
We would rather see your switchboard before we talk about chargers. The wall box is the easy part. The board, the incoming supply and the cable path between them decide the size of the job, and in Brighton those three things change from house to house. For the general picture, see our page on home EV charger installation across Melbourne.
Period villas, post-war houses and newer homes wire up differently
In the 2021 Census, 57.2 per cent of Brighton’s occupied private dwellings were separate houses, 22.4 per cent were semi-detached, terrace or townhouses, and 19.8 per cent were flats or apartments.
Victorian and Edwardian houses
Period houses tend to keep the meter box on a front or side wall, while the car lives at the back, sometimes in a garage down a side drive. We route the cable under the floor, through the roof space or along an outside wall in conduit, without lifting original boards or cutting decorative plaster.
The switchboard is the second question. An old board with rewireable fuses, or one with no room for another circuit, usually needs work first. A new main switchboard counts as prescribed work under Victorian rules, which means it isn’t energised until an independent Licensed Electrical Inspector has completed an inspection. Read what a switchboard upgrade for an EV charger involves for the detail.
Post-war modern houses
Amendment C192bays, gazetted on 9 October 2025, put ten Brighton post-war houses under heritage protection. Fox House at 6 Norwood Avenue, built in 1958 to a design by architect Keith Batchelor, is one; its statement of significance counts a “prominent, integrated carport” among the elements that matter. At Roubicek House, 51 Lynch Crescent, the listed elements include the “concrete columns and beams to the carport”. On houses like these we would mount on a later addition or a freestanding pedestal and leave that fabric alone.
Townhouses and newer houses
A newer house with an attached garage is often the simplest job, with the switchboard in or beside the garage. Townhouses vary more: if yours shares a driveway or meter bank, the cable route may cross common property, which brings in the owners corporation.
Apartments around the Bay Street and Church Street centres
Bayside’s activity-centre policies for Brighton’s Bay Street and Church Street centres encourage larger sites to be redeveloped as mixed-use buildings “with basement car parking”. The Bay Street retail core runs between Hillcrest Avenue and Asling Street, and the Church Street core between St Andrews and Male Street. Over time, more Brighton cars are likely to be parked underground, which is a different charging problem from a private garage.
In an existing building the owners corporation controls the common property, and under section 52 of the Owners Corporations Act 2006 a significant change to how that property is used or looks generally needs a special resolution first. We help committees with the electrical half of that decision: spare supply capacity, load management between chargers, and metering each lot’s charging. For new buildings, the National Construction Code sets requirements that include car-park distribution boards dedicated to EV charging. Both kinds of building are covered by our EV charging service for apartment and townhouse complexes.

Salt air between Middle Brighton Pier and Green Point
Bayside has 17 kilometres of coastline along Port Phillip Bay. Brighton’s stretch runs past Middle Brighton Pier, about 1.2 km from our premises, down to Dendy Street Beach, where in 2018 the Heritage Council found the beach and its “approximately 82 brightly painted Bathing Boxes” to be of State significance. The southern end of that beach is Green Point. Lovely spot, and a reminder that plenty of Brighton houses breathe salt air.
We haven’t found a salt-air rule written for EV chargers. The nearest yardstick we know is Table 6.3.9a in the NCC’s housing provisions, which sets protective coatings for structural steel by exposure: “within 50 m from sheltered bays” is rated High, beyond 50 m drops to Medium, and past a kilometre from a sheltered bay it’s Low. It isn’t a charger rule, but it is a sensible guide for brackets, fixings and conduit, and we judge each site on the day.
Close to the water, our approach is simple:
- mount the charger inside the garage where there’s a choice, or choose a model its maker rates for outdoor use that close to the water
- use stainless steel fixings and seal every cable entry
- bring conduit in from below so water can’t run down the cable into the unit
- check the meter box and outdoor switchgear too, since corrosion rarely stops at one enclosure
Our honest preference is the garage. A wall box facing the bay can be done properly, but salt is patient.
United Energy supplies Brighton, and that shapes the paperwork
Brighton 3186 shows up as United Energy territory in CitiPower and Powercor’s postcode locator, and the network’s December 2025 planning report includes Brighton in the area its Moorabbin zone substation supplies. Its electric vehicle guidance for homes says a wall or fast charger has to be installed by a registered electrical contractor and registered through its myEnergy online service. That registration is part of our job.
For a single-car household, single-phase power is usually enough. United Energy recommends a dedicated home unit for drivers covering 200 to 500 km a week, and gives eight to 12 hours as the time to fill a modern EV that way, though most nights only call for a top-up. At 32 A, a single-phase charger delivers roughly 7.4 kW. Victoria’s Service and Installation Rules include advice about big single-phase loads, so before fitting a 32 A unit we confirm what your network expects.
Three-phase is worth discussing once your weekly driving tops 500 km or a second EV arrives. United Energy points out that 22 kW units depend on a three-phase supply, yet the car still sets the ceiling, and a model limited to 7 kW on AC charges no faster from a bigger wall box. See how a three-phase power upgrade for EV charging works.
Bayside Council, heritage controls and public fast chargers
Brighton sits entirely within the City of Bayside, whose heritage policy asks owners to “site all ancillary services, including satellite dishes, air conditioning plants, solar heating systems, garbage facilities and the like, so they are concealed from the street”. EV chargers aren’t named, but in our reading a charger is exactly that kind of service, so on a heritage-listed house or a street-facing wall we plan around the policy.
Through its Charge while you shop project, Bayside has had 50 kW DC fast chargers built in shopping-precinct car parks, taking up to two neighbouring bays each, at no cost to Council; the project’s archived consultation page lists Black Rock, Highett and Beaumaris as complete. Handy as a backstop. Not where a busy household wants to spend its evenings, and Brighton has plenty of those: in 2021, 39.1 per cent of occupied dwellings had two vehicles and 16.0 per cent had three or more.
What changes the scope of a Brighton install
You won’t find prices on this page. Next-door neighbours in Brighton can need completely different jobs, and these are the things that decide it:
| Factor | How it shows up in Brighton |
|---|---|
| Cable run length | Period houses with the board at the front and the car at the back |
| Switchboard capacity | Older boards with no spare space or outdated protection |
| Supply type | Single-phase or three-phase, and whether the supply itself needs altering |
| Trenching and surfaces | Detached garages across paved courtyards or established gardens |
| Network approval | myEnergy registration, plus any application for a supply change |
| Charger model | Outdoor rating near the bay, smart features, tethered or untethered cable |
A charger supplied by your dealer only changes the last row. Everything else comes down to the house.

From photos to switch-on: how a Brighton job runs
- Photos and a call. Ring 1300 003 853 or use our contact page, and attach a few phone pictures showing your switchboard, meter box and parking.
- Site visit. We check the board, the property’s maximum demand, the supply type and the cable route.
- Written quote. Charger, circuit, any board or supply work, and the network steps, itemised.
- Network lodgement. We register the charger on myEnergy and lodge any supply application before you buy equipment that depends on it.
- Installation and testing. A dedicated circuit, protection to suit the charger, and the mandatory tests, including RCD operation, before energising.
- Certificate and handover. Your Certificate of Electrical Safety, plus app and charging schedule set-up.
Frequently asked questions about EV chargers in Brighton
Does Bayside Council have to approve a charger at my house?
Usually the question is planning, not wiring. If your house is in a Heritage Overlay, or the charger would face the street, check with Bayside’s planners first, since council’s heritage policy wants ancillary services kept out of street view.
Can a dealer-supplied charger be fitted instead of one of yours?
Yes. We check it matches your car and is approved for Australian use (United Energy’s safety advice says the same), then quote the circuit, any switchboard changes and the fitting.
Is single-phase power enough for one EV?
For most single-car households, yes. Beyond about 500 km a week, or with two EVs, look at three-phase power or load management.
Who registers the charger with United Energy?
We do, through United Energy’s myEnergy portal, as part of the job. The network expects a registered electrical contractor to install any wall or fast charger.
What paperwork will I get when the work is finished?
A Certificate of Electrical Safety covering the work. Where the job involved prescribed work, a new main switchboard for example, an independent Licensed Electrical Inspector has to sign it off before it goes live.
For a Brighton house, townhouse or apartment, the quickest start is an enquiry through our contact page for a quote, then a reply to our email with a few photos of the switchboard and of where the car is parked overnight. You can also call 1300 003 853, which we answer Monday to Saturday, 7am to 7pm. Further down the coast we also work from our Beaumaris premises on Charman Road, and closer to the city from our premises at 128 Toorak Road, South Yarra.